Hornblower Niagara Funicular
A Restoration Project
In the news at Niagara Buzz and Niagara This Week.
Turnkey services for the restoration of an iconic Niagara Falls attraction. The new system incorporates state of the art safety and control systems, while maintaining aspects of the mechanical and structural systems from the original heritage operation. The Hornblower experience has been enhanced with this breathtaking descent from the Table Top to the Falls’ edge.
De Beers Canada 10 Megalitre Tank
An EPCM Project
A challenging project in the far north! EPCM services for design and construction of a 10 million litre diesel fuel storage tank for De Beers Canada at their Snap Lake mine site. We designed the subgrade, tank and ancillaries around permafrost and rock outcrops, and we blasted, dug, leveled, compacted and erected plates to form a tank, including fire suppression, level control and piping systems, in time for first fill in March (when the winter road was available).
Crane Safety System
A Custom Safety Project
Incorporating the latest in communication, monitoring and lighting technologies, we developed an integrated safety product that ensures the safety of overhead crane operators. With this technology, operators have greater awareness of their proximity to inherent work hazards, and management is able to track the position of their employees relative to those hazards.
Cogent Transformer Clamps
A Specialized Welding Project
Our high quality welding meets military standards: as one part of a complex assembly, our welded transformer clamps adhered to strict dimensional tolerances without the need for machining.
Electric ‘53
An R&D Project
Conversion of a 1953 GMC classic pickup to an EV masterpiece. Retaining its traditional features on the outside, the body will house a custom frame, suspension, and electric drive providing a driving experience only found amongst the most luxurious vehicles on the road.
Main Steel Coil Polishing Line Safety Upgrades
An Integration Project
Turn-key services for the integration of a safety circuit into a steel coil polishing line for Main Steel in Harmony, PA. The modern safety PLC controlled safety circuit tied into the existing process line, providing Category 3 hazard safeguarding for the line operators while maintaining a high precision final product.